Eagle Rock Observatory

Construction Photos

Photos taken during initial construction of Eagle Rock Observatory

Partially completed wiring at the East workstation. A door segment support is visible at the left. Note the yellow foam insulation sprayed between the wall flange and floor near the right of the photo. The edge of the foam is sealed with clear caulking on the inside and tan caulking on the outside.